GOODPIPEBy Workwell
Membership

Pick your plan

Pro Monthly

Every GOODPIPE tool

Pro Yearly

Every GOODPIPE tool

Field Monthly

Field use tools: Damage Prevention Permit, MTR Scanner and GPS Photo

Field Tools for Inspection Teams

Field paperwork, checked and ready before it's submitted.

GOODPIPE builds focused tools for the LocusView Techs and field leads collecting data for Northern Natural Gas. Today they build work unit entry sheets from the maps and the 8335b/c, sign and sort crew OQ reports, redline MTRs, fill out dig permits, and check reviews for the discrepancies auditors flag, all in the browser, with every document kept on your own computer. Each tool keeps getting sharper as it's tested on real NNG reports, and new ones are always in the works, built around the jobs that slow crews down.

The toolkit

Eight tools ready today, with more on the way

Each tool handles one job that normally eats a field lead's evening or sends a project back from audit. OQ Signoff and Crew Qualifications share the same Veriforce reports, so a batch you load once works in both.

OQSIGNOFF Example · one file, three people
scan_0412.pdf · 4 pages
Split by person, signed and named from the report
  • p. 1Reyes, Mark OQs - TOR, COAT.pdf
  • pp. 2–3Hollis, Dean OQs - TOR, COAT, PRES.pdf
  • p. 4Pruitt, Cole OQs.pdf
10-12-26
MTRREDLINE Example · one packet, every MTR
MTR_Delivery_8-31.pdf · 121 pages
Turned upright, split per MTR, heat highlighted
  • p. 13P-4020 HT 751650.pdf
  • p. 17P-3820 HT 740664-02.pdf
  • pp. 31–32P-4020 HT 389477.pdf
P-4020
HT. 751650
WO: 01137247
PO: PGW54728
REVIEWAUDITOR Example · a Precheck report
Precheck CAPGTR1000011388.pdf · 14 pages
Checked the way the audit team checks it, boxed and noted
  • 71975Entered 551MO3, attached 471M06
  • 7237961696321 vs 61-696321: match exactly
  • 72370TS#1 entered, not attached
36 discrepancies to fix before submission
DIGPERMITS Example · one permit, on site
OP 80.111b · filled out on the phone
A few answers, both signatures, ready to file
  • When10-17-26 · 7:00 AM – 6:00 PM
  • Checklist17 items · Yes, 13 N/A
  • Saved asDamage Prevention 10-17-26 DF.pdf
Inspector Contractor
How it fits your team

Built around the way NNG field crews already work

Works alongside LocusView

Takes the paperwork around the job, so techs spend their time on the data that goes into LocusView.

Documents stay on your computer

Reports are read and signed right in the browser. Nothing is uploaded to a server.

Flags, never guesses

Reports are read cell by cell and the tools are tested on real NNG reports. Anything that can't be read cleanly is flagged for a person to check.

Fewer projects sent back

Techs catch the discrepancies auditors look for before they submit, so more projects pass the first time and the backlog shrinks.

Have a task that eats your crew's time?

Tell GOODPIPE what it is. The next tool on this page gets built from requests like yours.

Full checklist

If any question is answered No, the excavation shall not proceed.

    Page 1

    Drag the corners to the corners of the page.

    Where to find the Project ID

    1. Open the project in LocusView on the web (nng.locusview.io).
    2. Look at the address bar. The number right after /projects/ is the Project ID. Here it's 9087.
    3. Type that number in the LocusView Project ID box. It's remembered until you change it, so you only enter it once per project.
    The LocusView address bar reading nng.locusview.io/app/main/review/projects/9087, with 9087 circled in red

    Page

    Tap the page to zoom in. Arrow keys flip pages.

    Contact GOODPIPE

    Ask a question, request a tool, or set up a demo for your team.

    Opens your email app with the message ready to send.